24/7 service, Chattogram & nationwide
Application

Bridge & industrial pours

Large-volume pours for bridge decks, pile caps and machine foundations.

What makes it difficult

  • Large volumes poured continuously over long hours
  • Limited places to set up beside rivers or open ground
Method

How the job is done

01STEP 01

Plan

Sequence, volumes and contingencies are set.

02STEP 02

Pour

Pumped in the planned stages.

Checklist

Check before you start

  • Total volume and pour duration
  • Ground conditions where the pump stands

Need the right machine for your project?

One call or message for a quote, average response in 15 minutes.