Riverbank protection
Placing blocks, geo-bags and rock against erosion, from the bank, under control.
What makes it difficult
- Currents and tides limit the working window
- Blocks slip if the slope angle is wrong
- Getting heavy material to the bank is difficult
Method
How the job is done
01STEP 01
Prepare the slope
The bank is trimmed to the design slope.
02STEP 02
Bring in material
Loaders and trucks bring blocks or bags to the bank.
03STEP 03
Place
The excavator places them precisely.
Checklist
Check before you start
- Design drawing and slope angle
- Tide timings
- Space to stockpile material