Slab & high-rise concrete pouring

Fast, continuous pours on high-rise floors and large slabs, with a concrete boom pump.

What makes it difficult

  • A pour that stops midway leaves a cold joint
  • Getting concrete up and across a distance
  • Timing the ready-mix trucks
Method

How the job is done

01STEP 01

Position the pump

The pump is set where its boom reaches the whole slab.

02STEP 02

Coordinate trucks

The pour is matched to the ready-mix schedule.

03STEP 03

Continuous pour

The pour is completed without a break.

Checklist

Check before you start

  • Building height and the furthest point from the pump
  • Approximate concrete volume
  • Standing space for the pump and trucks
FAQ

Common questions

It is set by the building's height and the distance from the pump to the slab's furthest edge.