24/7 service, Chattogram & nationwide
Application

Foundation excavation

Digging footings and basements to the right depth and level.

What makes it difficult

  • Tight urban sites and the safety of neighbouring buildings
  • Deep cuts risk the sides collapsing
  • Timing trucks to take the spoil away
Method

How the job is done

01STEP 01

Layout and levels

Limits and depths are marked from the drawings.

02STEP 02

Dig in stages

Dug with safe batters or support.

03STEP 03

Remove spoil

Spoil is loaded straight into trucks and removed.

Checklist

Check before you start

  • Structural drawings and dig depth
  • Positions of neighbouring buildings and utilities
  • Spoil dump site and truck route
FAQ

Common questions

It depends on the depth, the volume and the space on site. Share the site details and the right size is recommended.

Need the right machine for your project?

One call or message for a quote, average response in 15 minutes.