Factory machinery shifting
Installing machinery in a new plant, or moving it from one place to another.
What makes it difficult
- Limited headroom and space inside the shed
- Shock or impact on sensitive machines
- Not disrupting production in a running plant
Method
How the job is done
01STEP 01
Measure and plan
Route, doorways and foundation are measured.
02STEP 02
Unload and move
Moved under control by crane or loader.
03STEP 03
Set in place
Set exactly on its foundation.
Checklist
Check before you start
- Machine weight, size and lifting points
- Shed door size and roof height
- The manufacturer's handling instructions