24/7 service, Chattogram & nationwide
Application

Piling support

Lifting piles and cages, moving rigs and handling material on piling sites.

What makes it difficult

  • Long rebar cages can buckle when lifted
  • Mud and drilling slurry leave soft ground
Method

How the job is done

01STEP 01

Set lifting points

Lifting points chosen so the cage does not bend.

02STEP 02

Lift and coordinate

The cage is lowered in step with the piling rig.

Checklist

Check before you start

  • Cage length and weight
  • Crane travel route on site

Need the right machine for your project?

One call or message for a quote, average response in 15 minutes.